Wednesday, 7 October 2015

Week 19

Title: Meeting With Supervisor to Show List of Hardware

Objective:
  1. To get confirmation about suitable material to buy.
  2.  To discuss the material need to use in the project 

Method:
  1. Show the specification of the hardware based on the project needs.
  2. Show all hardware listing to supervisor that need in your FYP project.
Result:
List of item:
1. Piezoelectric (20pieces)

2. Plywood



3. Steel (L-design)


4. Energy Harvesting Circuit.

5. Step-up voltage circuit



Conclusion:
By listing the component that need to buy, the project can start to be build for first stage.

No comments:

Post a Comment